As we haven't blogged in a long time i thought i would fill you in with info on the kitchen we are either going to get a B&Q or moben kitchen.
AppliancesWednesday, 11 November 2009
No Progress !!
Friday, 23 October 2009
Sign off of the stages
Bricks Approved


Saturday, 17 October 2009
Brick and Tile Match the Sequel
Piling work starts
Tuesday, 6 October 2009
Work Starts !!!
Later the same day the architect called to say we no longer need a step in the house - so it can all be at the same level - good news - but am confused about why this was such as issue before.
I am expecting a full new set of drawings to be produced this week. Have also asked for these on cad format.
In the meantime my new contractor is away on holiday so nothing will progress on that front for a while.
Also was told we cant have an air source heat pump so we are back to solar panels. More research needed.
Had a chat with Andy Bull who we met at the house renovation show about the network and cabling. Am waiting for some information from him so we can finalise the designs.
Tuesday, 29 September 2009
Keys
Sunday, 27 September 2009
Bathrooms
Kitchens





New Prices
Wednesday, 16 September 2009
Alternative prices ?
At last a response from the council
Thursday, 30 July 2009
Costings
Wednesday, 29 July 2009
A day of drama
However I got a call from the architect saying the tree officer had been on site with "all guns blazing" - and said we could not build with 9 metres of the tree trunk. The current plans show the house edge within 6 metres. If this was the case we would not be able to build or would have to very signifiantly reduce the size of the house making the whole project not worthwhile and the land next to worthless. He also said there was a drain running across the land which might need to be diverted and we would need a camera survey to assess whether it was actually used.
Both bits of news came as a shock but I had another read through all the correspondence and it seemed clear that we could build near the tree providing piled foundations were used. I called the architect back and explained this and he said he would speak to the council and get clarification. To cut a long story short it seems the tree officer got it wrong and we can build as designed as long as we take the right precautions. However we need to split the ground floor across two levels so the back of the house is 50 cm higher than the front ! The architect was confident he could work around this without spoling the design. He would need to check the impact on the higher floors. Oh and about the drains.. it is most likely they are disused which means we can probably just ignore them. However this still needs to be checked ofcourse.
The NHBC interview took all of 5 minutes and it seems this is fine and the policy has been activated.