Saturday, 17 October 2009

Piling work starts

The piling started on schedule on 5th October in the pouring rain but all seemed to proceed well. Half way through we were told the step had to come back but only 350 mm rather than the previous 500 mm. We can do this by grinding down the piles at the front.