Work finally started again at 9am on Monday 5th October. We all met on site in the pouring rain for the architect to check and finalise the levels. After that we had a short meeting at home to discuss changes needed to the drawings and pricing for stage 1. The architect suggested asking a quantity surveyor to comment on the pricing and provided a recommendation. I later made an appointment to see him.
Later the same day the architect called to say we no longer need a step in the house - so it can all be at the same level - good news - but am confused about why this was such as issue before.
I am expecting a full new set of drawings to be produced this week. Have also asked for these on cad format.
In the meantime my new contractor is away on holiday so nothing will progress on that front for a while.
Also was told we cant have an air source heat pump so we are back to solar panels. More research needed.
Had a chat with Andy Bull who we met at the house renovation show about the network and cabling. Am waiting for some information from him so we can finalise the designs.